We were also able to get our first glance at one of our kitchen cabinet drawers which was particularly exciting for Kellie
Cabinet installation will begin today and completed tomorrow and once they are installed we will finalize our paint color and hardwood floor stain color selection.
Walls are prepped to be tiled and here is a glance at the master bath shower area and tile that will be installed this week.
The interior doors also arrived and will be installed. We still need to select an exterior door and decide on paint color for the doors.
This is the french door that will open to the master bath
We are so thankful our project has gone off without a hitch and we have John at Reconstruct to thank for that.