Tuesday, April 9, 2013

FINAL TOUCHES ON HARDWOOD FLOORS

Today we are celebrating the last touches being applied to our hardwood floors.  Every sub contractor has shared that this job has been one of the most difficult because there are very few square rooms in our home.  The lot is a pie shape, with the corner tip of the pie being in our backyard.  The house was constructed to wrap forward as the lot comes out to what would be the crust of the pie.  So basically it's a sub contractor's nightmare and the hardwood floor crew has been quite challenged and it took them a day longer than they anticipated.  But today the finishing touches (all the small, oddly shaped pieces) were completed.



We were also able to get our first glance at one of our kitchen cabinet drawers which was particularly exciting for Kellie


Cabinet installation will begin today and completed tomorrow and once they are installed we will finalize our paint color and hardwood floor stain color selection.

Walls are prepped to be tiled and here is a glance at the master bath shower area and tile that will be installed this week.




The interior doors also arrived and will be installed.  We still need to select an exterior door and decide on paint color for the doors.



This is the french door that will open to the master bath


We are so thankful our project has gone off without a hitch and we have John at Reconstruct to thank for that.



No comments:

Post a Comment